Back to the list

Well No. 2-Grabinska was drilled

30.11.2021

Drilling of well No. 2-Grabinska has been completed for GEO-NADRA-INVEST LLC. Drilling of well No. 2-Grabynska began in October 2021 and was completed. The depth of the well is 1560 m.