Drilling of well No. 13-Bystrytska was successfully completed.
10.02.2022
Drilling of well No. 13-Bystrytska was started in January 2022 and completed. The depth of the well is 1610 m.
10.02.2022
Drilling of well No. 13-Bystrytska was started in January 2022 and completed. The depth of the well is 1610 m.